share:
Product introduction
※DPF(Diesel Particulate Filter) Ceramic Substrate is used in captures and stores particle for diesel-powered engine exhaust after-treatment system;
※The diesel-powered engine usually used in passage car, bus, LD-truck (light duty truck), HD-truck (Heavy duty truck), on-highway, off-highway and stationary power;
※The DPF(Diesel Particulate Filter) Ceramic Substrate support exhaust aftertreatment system, meet EuroIV, EuroV, EuroVI, EuroVII and Tier3, Tier4 emission standards;
※The material of the DPF(Diesel Particulate Filter) are Cordierite-2MgO•2Al2O3•5SiO2;
※DPF(Diesel Particulate Filter) Ceramic Substrate with alternate blocked cell design, leading and force the gas flow through the micropore cell wall,
※The diesel-powered engine exhaust gas flow in open cell, flow through the wall and flow out from the next open cell. So, the DPF(Diesel Particulate Filter) also called Wall-flow Filter;
※DPF(Diesel Particulate Filter) particle filtration efficiencies exceed 90% and meet Particulate Matter (PM) and Particular Number (PN) emission standard requirements;
※The DPF(Diesel Particulate Filter) can be coated with catalyst and then was called CDPF(Catalyst Diesel Particulate Filter). The catalyst raw material includes Rare Earth, Alumina, Platinum Group Metal (PGM), Cu-Zeolite, Fe-Zeolite and so on coated on the wall surface of the holes.
Quick Details
Year:Universal
Model:Universal
Engine:Universal
Car Fitment:Universal
Size:Standard, Custom designed
Warranty:12 Months
Place of Origin:Shandong, China
Car Model:diesel car
Certification:sgs/tuv/bv
Type:Catalytic Converter/diesel particulate filter
Standard:Euro 3 - Euro 5
Product Name:for Diesel Particulate Filter/ DPF Cleaning/ dpf filter
Shell Outside Size:Custom designed
DPF substrate Size:Custom designed
Pt Pd:Custom designed
Material:Cordierite
Supply Ability
5000 Piece/Pieces per Week
Packaging & Delivery
Packaging Details
4 pcs in a carton protecting with foam, then packed the cartons in a wooden box for long distance shipment
Port : China port
Lead Time:
Quantity(pieces) | 1 - 30 | 31 - 80 | 81 - 500 | >500 |
Est. Time(days) | 15 | 20 | 25 | To be negotiated |